Article

Share on :
18 November 2019

To face the problem of shortage of freshwater, representing only 2.5 percent of Earth’s water, a sea dock in Miami beach was made with concrete mixed with seawater. The designers used Glass and Basalt FRP as reinforcement. More information available here.